Genuine fan shroud and Volute ring
Sunday, 23 February 2014
Fuel regulator mounting
Made up some posts to mount the regulator on, the idea being to allow easy engine removal with AN fittings. Dynamat on firewall between ribs with OE spec card in front, trying to maximise space.
Hard fuel line install
Had to make up a bulkhead fitting to allow union to fit secure. Rolled up some thin sheet to make a tube and welded the same to a washer for welding to firewall.
Saturday, 22 February 2014
Loctite Flange Sealant
Made some progress in sealing up the case and torquing it down.
Image also shows enlarged drain channel, lifter lube and assembly oil in place ready for cam.
Sunday, 16 February 2014
Crank Gear install
Fortunately had time to also install remaining bearings and check end play with current three shims selection that I had available coming out at .0035. Now have a fully built up crank as I also managed to get the crank gears installed and woodruff keys in as well.